Release highlights

32 items • 2026-05-18

The version 2026 of Steel Projects PLM is now available! This major release introduces many features that will help make your daily work easier and improve your user experience! document is a list of all the latest features added to the release. Please note that they are available if the corresponding licenses have been acquired in the first place.

SP.PROJECT

5 items
1 / 32

Simplified exports from Production Manager

We added an option in the export configuration to use the export function directly from the Project Manager selection window.

01-Import-configuration.png
01-Import-configuration.png
02-Export-from-the-selection-window.png
02-Export-from-the-selection-window.png
2 / 32

Improved the propagation from a standard project

We added additional checks and propagation rules when standard projects are modified.

  • Drawing: Name/Description/Owner/Grade; default process and finish/Comments/Mark-up coefficient/Project category/Drawing quantity.
  • Assembly: Assembly category/Grade; default process and finish/Description/Comments/Mark-up coefficient/Assembly quantity.
  • Part: Name/Section/Profile/Grade/Process/Finish/Profile group/Unit/Comments/Description/Part type/Quantity/Product usage/Mark-up coefficient/Part camber/Machining list/Part drawing.
01-Standard-project-creation.png
01-Standard-project-creation.png
02-Standard-project-icon.png
02-Standard-project-icon.png
03-Data-propagation.png
03-Data-propagation.png
3 / 32

Decide scribing momentum for welded beams

We added an option in Project Manager to control whether scribing is assigned before or after assembly.

01-Copie-ecran.png
01-Copie-ecran.png
4 / 32

Simplified master part change after TEKLA import

We replaced the blocking message with a warning message and confirmation to proceed with the change.

01-Master-part-change.png
01-Master-part-change.png
02-Message-before-the-development-and-after.png
02-Message-before-the-development-and-after.png
5 / 32

Copy of project or plan products

We added a checkbox in the copy form to specify whether the linked products should also be copied.

Drawing copy: if the product option is checked, we will copy the products linked to the drawing and the assemblies\pieces.

Project copy: if the product option is checked, we will copy only the products that are directly linked to the project.

01-Copie-d-ecran.png
01-Copie-d-ecran.png
02-Copy-of-project-or-plan-products.png
02-Copy-of-project-or-plan-products.png

SP.PRODUCTION

5 items
6 / 32

Improved impact on existing fabfjob after configuration changes.

We improved the rules used to change the status of the fabjob.

  • Additions in the layout: machine, path, machining.
  • Deletion of a machine that is not used by the fab job.
  • Deletion of a path for a profile group that is not used by the fab job.
  • Deletion of a machining operation on a machine that is not used by the fab job.
  • Disabling a profile group on a machine.
  • Enabling a profile group on a machine.
01-Manufacturing-order-MEF-to-be-checked.png
01-Manufacturing-order-MEF-to-be-checked.png
7 / 32

New scheduling module

The goal is to plan projects, drawings, production phases, or jobs over the coming weeks. Each week, the workload is defined for each tracking type corresponding to the main production stages. The items to be scheduled are listed by priority. Each week is constrained by the available resources. The user fills the production weeks, for each tracking type, with guided assistance and alerts.

01-Menu-icon.png
01-Menu-icon.png
02-Parameters.png
02-Parameters.png
03-Main-screen.png
03-Main-screen.png
04-Summary-screen.png
04-Summary-screen.png
05-Tools.png
05-Tools.png
8 / 32

New sequencing module

This module allows you to allocate and organize the parts to be produced across workstations for a week or a day. We have integrated real-time interactions with scheduling and all production data:

  • Manual interactions with Workshop Assistant.
  • Automated interactions with CNC machines.

Operators using Workshop Assistant will be able to view the day’s priorities and track them.

01-Menu-icon.png
01-Menu-icon.png
02-Week-view.png
02-Week-view.png
03-Day-view.png
03-Day-view.png
04-Remaining-work-summary.png
04-Remaining-work-summary.png
9 / 32

Assembly category for route selection in the layout (automatic/manual welding)

We have added conditions to workstations to determine whether an assembly category is accepted.

The assembly category is defined in Project Manager based on various configurable characteristics: dimensions, number of secondary parts, weights, and profile types.

This option determines the choice of possible paths when sending to production. It is useful for automatically assigning the process to a manual welding station or a welding robot.

01-Assembly-category-setup.png
01-Assembly-category-setup.png
02-Machine-configuration.png
02-Machine-configuration.png
03-Assigning-the-category-to-master-parts.png
03-Assigning-the-category-to-master-parts.png
04-Route-selection.png
04-Route-selection.png
10 / 32

New web-based dashboard

In a web browser, we can display three specific views:

  • A card view that represents a daily “to-do” list (start/end dates)
  • A table view that summarizes the key dates
  • A Gantt view showing periods and durations over time

This new feature is available with the Production Manager license and perfectly complements scheduling module. A new shortcut is available on the main menu next to Planning and Scheduling.

01-Access-from-SP.png
01-Access-from-SP.png
02-Card-view.png
02-Card-view.png
03-Table-view.png
03-Table-view.png
04-Gantt-view.png
04-Gantt-view.png

SP.INTERFACE

6 items
11 / 32

Continuous improvement – PNI format

We have added data to our standard PNI format (manual exchange via files or automatic exchange via API), which enables integration with external software.

Added exchangeable information:

  • PNI export for and from projects.
  • Export of assembly information.
  • Export of surface area.
  • Export of production orders and parts.
  • Management of bundle information for bars.
  • Addition of stock certificate and country information.
  • Addition of machine block.

Addition of entry points to our WebAPI for even smoother data exchange:

  • Import/read a production order.
  • Export/send a project and a production order.
01-Exchanges.png
01-Exchanges.png
12 / 32

Providing a standard format for machine production feedback (PSR)

We added a new import that allows the feedback process to read a PSR format for any machine\workstation who deliver this standard format.

01-Feedback-import-configuration.png
01-Feedback-import-configuration.png
13 / 32

BOM imports for Advance Steel

We added a dedicated import with a specific interface. This XML import retrieves the project structure and links it with the DSTV files. This import is protected by the DSTV import license.

01-Import-configuration.png
01-Import-configuration.png
02-XML-file-example.png
02-XML-file-example.png
14 / 32

Added STEP-format scribing import

We added support for reading “wire” entities as scribing.

01-Scribing-import-example.png
01-Scribing-import-example.png
15 / 32

Tekla Structures 2026 compatibility

SP macros in Tekla and the Tekla links in SP are compatible with version 2026.

01-Tekla-2026-logo.png
01-Tekla-2026-logo.png
02-Tool-in-SP.png
02-Tool-in-SP.png
03-Option-in-SP.png
03-Option-in-SP.png
16 / 32

Redesign of our TEKLA macro/plugin (CAM3D vs XML)

CAM3D export in Tekla and Tekla import 1.26.xxxx import in SP will replace the TEKLA XML macro. For now, it is important to test and compare results before completely abandoning the XML format. Files exported are named *.tsm for Teka Structure Model (*.tsd = Tekla Structure Data).

01-TEKLA-logo.png
01-TEKLA-logo.png
02-Call-from-TEKLA-icon.png
02-Call-from-TEKLA-icon.png
03-Macro-options.png
03-Macro-options.png
04-Options-in-TEKLA.png
04-Options-in-TEKLA.png
05-Project-Management-import.png
05-Project-Management-import.png

SP.NESTING

6 items
17 / 32

Added traceability information to nesting views

We added columns to the current view to show the material ID and the operator.

01-Copie-d-ecran.png
01-Copie-d-ecran.png
18 / 32

Verification of drilling technologies in bar nesting

We added a parameter for the technologies accepted by a machine. When building bars, we compare them with the technologies required by the parts. If they do not match, we display a warning message on the bar.

01-Machine-option.png
01-Machine-option.png
02-Issue-example.png
02-Issue-example.png
19 / 32

Integration of AlmaCAM version 4.1.2 (SP2)

We integrated AlmaCam 4.1 SP2 into our solution.

01-AlmaCAM.png
01-AlmaCAM.png
20 / 32

Added connection status with AlmaCAM

We added an icon that lets users track the connection progress with AlmaCam.

Button status and action:

  • Colored gray: Connection in progress
  • Colored green: Connection established: he button becomes active and can be used to launch AlmaCam
  • Error message : Connection failed
01-Icons-button.png
01-Icons-button.png
02-Error-message.png
02-Error-message.png
21 / 32

Assigning the cutting tool based on internal contours in plate nesting

We added tables in the machine resources to assign a different cutting tool based on the requested speed. This speed is linked to the perimeter or the area of the internal contour. The post-processor generates the instructions according to the selected tool and informs the machine. From the part drafter, it is possible to check and even change the cutting tool manually.

01-Resource-configuration.png
01-Resource-configuration.png
02-Cutting-tool-assignment.png
02-Cutting-tool-assignment.png
22 / 32

Micro-percussion management in plate nesting

We integrated this technology choice across all production steps (parameters, selection, post-processor).

01-Tools.png
01-Tools.png
02-Technology-assignment.png
02-Technology-assignment.png
03-Marking-type-in-the-drawing.png
03-Marking-type-in-the-drawing.png
04-Automatic-marking-configuration.png
04-Automatic-marking-configuration.png

SP.INVENTORY

7 items
23 / 32

Integration of scrap options for bars

We added a new option to manage bar scrap options. Forecast scraps can be used as an “option” by bar nesting and become “stock” when the parent bar is produced.

This option is only available with our stock integrated and uses the same logic as for plate nesting.

  • Ability to import scrap options into bar nesting.
  • Ability to view available scraps.
01-Scrap-generation-conditions.png
01-Scrap-generation-conditions.png
02-Scrap-list.png
02-Scrap-list.png
03-Using-scraps.png
03-Using-scraps.png
24 / 32

New supply management modes for nesting

We added a new global option to define how supplies are managed.

We have the following options:

  • Supply(standard): purchasing ON, stock update ON, stock output through feedback ON.
  • No supply management: purchasing OFF, stock update ON, stock output through feedback ON.
  • Not managed: purchasing OFF, stock update OFF, stock output through feedback OFF.
01-General-option.png
01-General-option.png
02-Type-display.png
02-Type-display.png
03-Type-conversion-if-when-supplies-are-required.png
03-Type-conversion-if-when-supplies-are-required.png
25 / 32

Stock threshold management

We added stock configuration data to define the list of profiles to monitor, with minimum and maximum values.

In the stock list, we can visualize threshold issues with color codes.

01-Threshold-monitoring-setup.png
01-Threshold-monitoring-setup.png
02-Threshold-visualization.png
02-Threshold-visualization.png
26 / 32

Four weeks stock projection

We added a screen to visualize a 4 weeks stock projection.

01-Icon.png
01-Icon.png
02-View-in-the-current-SP-stock-screen.png
02-View-in-the-current-SP-stock-screen.png
27 / 32

Stock import from other projects, nestings, or companies

We added a general parameter to choose the pattern and import additional stock. Imported stock is visible but locked by default. If needed, it can be unlocked and used. Stock from other companies is informational only and cannot be used.

01-General-option.png
01-General-option.png
02-Access-from-nesting-stock-import.png
02-Access-from-nesting-stock-import.png
03-Case-other-project.png
03-Case-other-project.png
04-Case-other-nesting.png
04-Case-other-nesting.png
05-Case-other-company.png
05-Case-other-company.png
28 / 32

Added an option for automatic stock output

We added a general parameter to choose the pattern. If the workflow is manual, the user must validate the issues through a dedicated screen.

01-General-option.png
01-General-option.png
02-Issue-validation-screen.png
02-Issue-validation-screen.png
29 / 32

Availability of the Web Stock version for our pilot customers

We added a hidden parameter that enables access to the Web Stock mode. The launch will be integrated into SP screens. The user will also be able to open it in an external browser.

01-Access-from-Stock.png
01-Access-from-Stock.png
02-Stock-Web.png
02-Stock-Web.png

SP.WORKSHOP

2 items
30 / 32

Integration of machine energy consumption

We collect machine energy consumption information from Ficep machines.

01-Ficep-information.png
01-Ficep-information.png
02-Display-in-bars-feedback.png
02-Display-in-bars-feedback.png
03-Report.png
03-Report.png
31 / 32

Improved bundle visualization in WA Windows

We display a specific “bundle” icon (packet), its unique number, and its composition. This option is only available in the Windows version.

01-Visualization-in-lists-and-access-to-the-composition.png
01-Visualization-in-lists-and-access-to-the-composition.png
02-Improved-bundle-visualization-in-WA-Windows.png
02-Improved-bundle-visualization-in-WA-Windows.png

SP.VARIOUS

1 item
32 / 32

SQL Server 2025 compatibility

SP is compatible with SQL Server 2025. The compatibility minimum is now SQL Server 2016 and higher. During the upgrade, we will also display a warning message.

01-SQL-Server-2025-logo.png
01-SQL-Server-2025-logo.png